NEC-calculated demand — your panel's real load
0A100A panelOver capacity
NEC 220.83 Breakdown
General lighting (sq ft × 3 VA)—
Required branch circuits4,500 VA
Existing appliances (non-HVAC)—
New loads @ 50% demand factor—
After tiered demand factor—
HVAC @ 100% [220.83(B)]—
NEC calculated demand—
Calculated service amps—
Recommended service size—
Per 2023 NEC § 220.83 optional method (Texas adopted Sept. 2024). Lighting: 3 VA/sq ft. Demand: 100% on first 8 kVA, 40% on remainder. HVAC added at 100% outside tiered demand; only larger of heating or cooling used.