Back to all tools
Electrical Panel Load Assessment
What This Is
Calculate your home's real electrical demand using the same NEC code standard a licensed electrician uses for permits.
How To Use It
Enter your home details, current panel size, and existing appliances. Then add any upgrades you're planning — EV charger, heat pump, and more.
Why It Matters
Adding modern loads to an undersized panel is a hidden safety and capacity risk. This tells you straight whether your panel can handle what's next.
Home Details
2,000 sq ft
Exclude garage, open porches, unfinished spaces (per NEC 220.12). Sunny calculates what your system is carrying now — and what it'll need to carry next.
Existing Appliances
Uncheck anything you don't have
Heating / Cooling — select one
Central A/C
Avg 8 kW unit · 33.3A × 240V
1
Electric Furnace
Avg 12 kW unit · 50A × 240V
1
Planned Additions
What are you looking to add?
🔌 Your Panel Assessment Is Ready
Sunny's run the full NEC 220.83 calculation. Enter your info and your results unlock instantly — right here.
Lord Overload & The Rusted Relic — Threat Assessment
NEC-calculated demand — your panel's real load
0A100A panelOver capacity
NEC 220.83 Breakdown
General lighting (sq ft × 3 VA)
Required branch circuits4,500 VA
Existing appliances (non-HVAC)
After tiered demand factor
NEC calculated demand
Calculated service amps
Recommended service size
Per 2023 NEC § 220.83 optional method (Texas adopted Sept. 2024). Lighting: 3 VA/sq ft. Demand: 100% on first 8 kVA, 40% on remainder. HVAC added at 100% outside tiered demand; only larger of heating or cooling used.
"Sunny sees what your system was built for, what it's carrying now, and what it'll need next. Get your full assessment — real answers, no pressure."
Schedule a Consultation
$119 consultation, credited toward same-day approved work · flat price quoted on site, before any work starts
* Average only — not a quote or estimate of work
🔌 Threat Identified
Lord Overload
Your panel is currently running at:
Of its safe capacity
The Turn
Then Supersun Sends In Sunny
Sunny sees what your system was built for, what it carries now, and what it'll be asked to handle next. A licensed service upgrade — sized correctly, grounded properly, and pulled to code — clears the threat and future-proofs your home for everything you're planning to add.
"I see what your system was built for, what it's carrying now, and what it'll handle next. That's not theory — it's protection." — Sunny
✓ Your Home, Future-Proofed
Recommended service size for your home:
Amp service
Current panel
NEC calculated demand
Code
Permit + inspection
Lifetime
Workmanship warranty
Your NEC 220.83 Assessment
Home size
Current panel
Year built
NEC calculated demand
Recommended service
Per 2023 NEC § 220.83 optional method (Texas adopted Sept. 2024). This is a calculation, not a quote — pricing is given on site after a licensed electrician looks at your panel.
⚠️
This is an estimate, not a final assessment. This calculator is an educational planning tool. To be code-compliant and safe, a licensed electrical contractor must perform the actual load assessment on-site before any work is done. Supersun (TECL #39536) will verify these numbers in person.
Adding modern loads to an undersized panel is a real safety risk. One call to Supersun, and Sunny makes sure your home can handle what's next.
Schedule My Assessment
$119 consultation, credited toward same-day approved work · Real heroes think ahead.
All calculations are estimates based on Austin Energy avg rates ($0.155/kWh), national appliance data, and Supersun's installed pricing.
Actual results vary by home. Schedule a consultation for a precise evaluation.

Supersun Electric · TECL #39536
Licensed and Regulated by the Texas Department of Licensing & Regulation (TDLR)
P.O. Box 12157, Austin, TX 78711 · 1-800-803-9202 · www.tdlr.texas.gov
By scheduling services or otherwise engaging with Supersun Electric, you agree to our Terms of Service.